Collection service contracts
Contracted sites, service schedules, eligible feedstock, per-tonne or site fees and contamination rules. Tariffs and volumes remain unverified.
A proposed two-sided business connecting paid source-separated collection with tested soil-product sales. Early support is intended to prove tariffs, route density, offtake, regulatory feasibility and engineering before committing to a plant.
A model that only works if customers pay and unit costs are controlled.
SAMAD ARD proposes a commercial recovery service to segregating waste generators and a tested soil-product supply offer to farms and landscape operators. Both revenue lines depend on demonstrated willingness to pay and proven execution.
Contracted sites, service schedules, eligible feedstock, per-tonne or site fees and contamination rules. Tariffs and volumes remain unverified.
Finished tonnes meeting quality specifications multiplied by achievable delivered sales price. Initial focus: soil-growing farms and landscaping, subject to trials.
Reliable routes, batch-level material records, product testing and transparent reporting—measured against incumbent providers, not asserted as unique.
Two financing steps: commercial and technical validation first; construction and commissioning only after site, process and contract evidence.
01Target central kitchens, caterers, hotels and produce-distribution clusters. Test paid collection terms and route density.
02Run product specification discussions and controlled compost trials with soil-growing farms and landscaping buyers.
03Engineer a permitted, serviceable facility to the contracted scale and verified off-take, with specialist operating leadership.
These two scenarios must not be conflated: the 5–10 tonne/day concept has not been engineered and costed; the earlier 4-tonne/day spreadsheet is an illustrative screening case, not a financing offer.
Semi-mechanized commercial facility. Final throughput depends on site, process engineering, carbon-rich bulking materials, permits, procurement and contracted supply.
Used to screen route, collection, staffing and equipment assumptions. Its indicative startup envelope of QAR 2.18m cannot be assigned to the larger facility.
No supplier quotations, verified tariffs, final site costs or contracted offtake underpin these figures; the 5–10 t/day design needs its own new engineering budget.
The reference model was deliberately designed to reveal risk rather than present promised returns. Revenue must be tested against collection distance, occupancy/utilization, contamination, product yield, realized compost netback, staffing and working capital.
Illustrative collection tariff in the financial screen—unverified, not a market quote.
Approximate collection tariff required for modeled break-even at 85% utilization in the 4 t/day reference scenario, assuming other inputs unchanged.
The modeled collection tariff gap is approximately QAR 381 per tonne at 85% utilization in the earlier 4 t/day screening case. It is a decision threshold to investigate, not a quoted market price.
Test contracted monthly fees, pickup frequency and the effective revenue per accepted tonne.
Cluster generators, verify route density, loading time, fuel and rejected-load costs.
Price labor, bulking material, downtime, equipment, water and achievable utilization.
Prove saleable yield, lab-approved quality, delivery costs and realized buyer prices.
Proceed to an engineered investment case only if revised contribution margins, available contracted supply and working-capital needs support the chosen configuration. Otherwise redesign the model or defer fixed assets.
This gap is a reason to validate pricing and redesign costs—not a forecast of what customers will pay. No investment return, break-even date or positive cash flow is represented as established.
Regulatory memo, site options, process engineer, vendor quotations and initial feedstock/offtake conversations.
Evidence of lawful route, suitable site, customer interest, achievable fees and robust unit economics before committing major capital.
Approve civil works, compliant collection and plant equipment, recruit technical expertise, train staff and test process stability.
Start contracted collection and monitored composting; release only tested batches and track customer retention, cash and yields.
Scale routes, products and R&D only where operational evidence, repeat purchasing and financing justify them.
Waste audits and buyer interviews; priced collection-route trials; qualified technical and environmental advice; preliminary site checks; supplier RFQs; product testing protocol; and a basic traceability proof of concept.
Advance to site and equipment commitments only after viable customer terms, accessible feedstock and offtake, an acceptable permit pathway, competitive quotations and a revised cash-flow model are independently reviewed.
Obtain source-separated tonnes, route density and collection fees from real sites, not broad waste estimates.
Test salinity, maturity and crop response, secure indicative buyer prices and delivery terms.
Verify acceptable feedstocks, industrial zoning, treatment and transport permissions, odor, drainage and leachate controls.
Secure specialist engineering and training; price fleet, equipment, maintenance, land and working capital with quotations.
Map existing public and private alternatives, delivery terms and service economics; differentiate through measured outcomes.
Use verified mass-balance and appropriate impact baselines; assess inventive novelty before any patent claim.